Sunday, December 28, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Air Canada flight makes emergency landing at Edmonton airport, TSB investigates

    Air Canada flight makes emergency landing at Edmonton airport, TSB investigates
    EDMONTON — Three of four passengers sent to hospital after an Air Canada Express flight appeared to trail sparks during an emergency landing at Edmonton International Airport have been released.

    Air Canada flight makes emergency landing at Edmonton airport, TSB investigates

    Canada adds 43,100 jobs in October, unemployment rate falls to 6.5 per cent

    Canada adds 43,100 jobs in October, unemployment rate falls to 6.5 per cent
    OTTAWA — Canada's latest labour-market survey says the economy generated 43,100 net new jobs in October and dropped the unemployment rate to 6.5 per cent, its lowest level since November 2008.

    Canada adds 43,100 jobs in October, unemployment rate falls to 6.5 per cent

    Baloney Meter: Does the income-splitting plan only benefit 15% of Canadians?

    Baloney Meter: Does the income-splitting plan only benefit 15% of Canadians?
    OTTAWA — "The prime minister and the finance minister in the past week haven't been able to say the words 'income splitting' in this House. They are running from their own policy. They clearly don't want to draw attention to the fact that 85 per cent of Canadian households get absolutely nothing from this plan." — Liberal Leader Justin Trudeau in the House of Commons, Nov. 5.

    Baloney Meter: Does the income-splitting plan only benefit 15% of Canadians?

    Head of China's Amazon wants to sell 200,000 Canadian lobsters on his site

    Head of China's Amazon wants to sell 200,000 Canadian lobsters on his site
    HANGZHOU, China — Chinese e-commerce juggernaut Alibaba hopes to sell 200,000 Canadian lobsters next week, its founder declared Friday — one dividend of Stephen Harper's ongoing effort to cultivate "pretty important" economic ties between the two countries.

    Head of China's Amazon wants to sell 200,000 Canadian lobsters on his site

    Justice minister sees possible silver lining in wake of harassment controversy

    Justice minister sees possible silver lining in wake of harassment controversy
    OTTAWA — Justice Minister Peter MacKay says the misconduct allegations made against two Liberal MPs — along with the sexual violence allegations made against former CBC host Jian Ghomeshi — could have a silver lining.

    Justice minister sees possible silver lining in wake of harassment controversy

    Canada signals it intends to buy at least four F-35s by 2017: Pentagon briefing

    Canada signals it intends to buy at least four F-35s by 2017: Pentagon briefing
    OTTAWA — A leaked Pentagon briefing says Canada has signalled to Washington that it wants to buy at least four F-35 stealth fighters, but a spokesman for Public Works Minister Diane Finley insisted Friday that no decision has been made.

    Canada signals it intends to buy at least four F-35s by 2017: Pentagon briefing