Tuesday, June 30, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Canada's Powder Highway In British Columbia: 8 Ski Resorts Along 1 Stunning Mountain Circuit

    Canada's Powder Highway In British Columbia: 8 Ski Resorts Along 1 Stunning Mountain Circuit
    ROSSLAND, B.C. — For many in the skiing world, the resorts of Canada's Powder Highway in British Columbia's Kootenay region are secrets they'd rather not share with the public.

    Canada's Powder Highway In British Columbia: 8 Ski Resorts Along 1 Stunning Mountain Circuit

    More details expected Monday on Canada's Iraq mission as bombing raids continue

    More details expected Monday on Canada's Iraq mission as bombing raids continue
    OTTAWA — An update is expected today on Canadian military activities in the skies over Iraq as part of the international campaign against the Islamic State of Iraq and the Levant.

    More details expected Monday on Canada's Iraq mission as bombing raids continue

    Harper and Wynne set for first meeting in more than a year

    Harper and Wynne set for first meeting in more than a year
    TORONTO — Prime Minister Stephen Harper is set to meet with Ontario Premier Kathleen Wynne today, marking their first face-to-face talk in more than a year.

    Harper and Wynne set for first meeting in more than a year

    Cheaper crude oil might actually benefit Canadian economy: RBC study

    Cheaper crude oil might actually benefit Canadian economy: RBC study
    OTTAWA — Perhaps an era of cheap crude won't be so bad for Canada after all.

    Cheaper crude oil might actually benefit Canadian economy: RBC study

    Survey said fewer Canadians expect to achieve current financial goals

    Survey said fewer Canadians expect to achieve current financial goals
    TORONTO — A survey conducted for CIBC (TSX:CM) finds 65 per cent of Canadians ended 2014 feeling confident about reaching their current financial goals.

    Survey said fewer Canadians expect to achieve current financial goals

    Julian Fantino's statement after shuffle moves him out of Veterans Affairs

    Julian Fantino's statement after shuffle moves him out of Veterans Affairs
    OTTAWA — The text of a statement issued Monday by Julian Fantino after he was removed as minister of veterans affairs and returned to his old job as associate minister of defence:

    Julian Fantino's statement after shuffle moves him out of Veterans Affairs