Saturday, May 23, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Obama 'Colbert' show appearance won't have Canada's oilpatch laughing

    Obama 'Colbert' show appearance won't have Canada's oilpatch laughing
    WASHINGTON — In the Monday night episode of "The Colbert Report," the joke was on Canada's oil industry.

    Obama 'Colbert' show appearance won't have Canada's oilpatch laughing

    Prince George Mountie Stabbed During Arrest, IIO Investigating: RCMP

    Prince George Mountie Stabbed During Arrest, IIO Investigating: RCMP
    RCMP say two officers stopped three people on foot at about 11 p.m. Monday, and found one man had several outstanding warrants for his arrest.

    Prince George Mountie Stabbed During Arrest, IIO Investigating: RCMP

    Vancouver-born actress-dancer Stephanie Moseley found dead in Los Angeles

    Vancouver-born actress-dancer Stephanie Moseley found dead in Los Angeles
    TORONTO — A Canadian star of the VH1 drama series "Hit the Floor" about NBA cheerleaders has died in what Los Angeles police say was an apparent murder-suicide.

    Vancouver-born actress-dancer Stephanie Moseley found dead in Los Angeles

    Windy Weather Cancelled Over Two Dozen Morning Sailings: BC Ferries

    Windy Weather Cancelled Over Two Dozen Morning Sailings: BC Ferries
    VICTORIA — BC Ferries says it has cancelled more than two dozen sailings on seven different routes because of adverse weather.

    Windy Weather Cancelled Over Two Dozen Morning Sailings: BC Ferries

    Competition bureau to get new powers to probe Canada-US price gap: Moore

    Competition bureau to get new powers to probe Canada-US price gap: Moore
    TORONTO — Canada's competition bureau is getting new powers to investigate why many items cost less in the United States.

    Competition bureau to get new powers to probe Canada-US price gap: Moore

    YouTube stars like Lilly Singh and Megan MacKay a new breed of celebrity

    YouTube stars like Lilly Singh and Megan MacKay a new breed of celebrity
    TORONTO — When Lilly Singh arrived on the set of the Kunal Nayyar movie "Dr. Cabbie" earlier this year, she faced a bit of a learning curve.  

    YouTube stars like Lilly Singh and Megan MacKay a new breed of celebrity