Saturday, May 23, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    WorkSafe BC Report Shows New Dual-investigation Tool Following Mill Explosions

    WorkSafe BC Report Shows New Dual-investigation Tool Following Mill Explosions
    B.C.'s workers safety authority has introduced a new investigation model that improves the chances of criminal prosecutions for job site incidents.

    WorkSafe BC Report Shows New Dual-investigation Tool Following Mill Explosions

    Blake Nill Named Head Coach Of UBC Thunderbirds Football Team

    Blake Nill Named Head Coach Of UBC Thunderbirds Football Team
    VANCOUVER — The University of British Columbia Thunderbirds have hired Blake Nill to be the head coach of their football team.

    Blake Nill Named Head Coach Of UBC Thunderbirds Football Team

    Samsung Phone Explodes Next To Ontario Girl

    Samsung Phone Explodes Next To Ontario Girl
    An Ontario University student revealed that her Samsung Galaxy Ace phone exploded next to her while she was sleeping. The incident, which happened in October, only came to light when the media reported it Monday.

    Samsung Phone Explodes Next To Ontario Girl

    Harper calls oil and gas regs 'crazy economic policy' in times of cheap oil

    Harper calls oil and gas regs 'crazy economic policy' in times of cheap oil
    OTTAWA — Prime Minister Stephen Harper has definitively slammed the door on regulating Canada's oil and gas sector, calling it a "crazy, crazy" economic policy under current global oil prices.

    Harper calls oil and gas regs 'crazy economic policy' in times of cheap oil

    Halifax wants to extend municipal voting rights to permanent residents

    Halifax wants to extend municipal voting rights to permanent residents
    HALIFAX — The mayor of Halifax says he wants his city to become one of the first in Canada to grant permanent residents the right to vote in municipal elections.

    Halifax wants to extend municipal voting rights to permanent residents

    Urine found in hospital water cooler in St. John's, N.L., health board says

    Urine found in hospital water cooler in St. John's, N.L., health board says
    ST. JOHN'S, N.L. — Health officials in eastern Newfoundland say it appears someone poured urine into the tower of a hospital water cooler used by staff and patients.

    Urine found in hospital water cooler in St. John's, N.L., health board says