Saturday, May 23, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Critics ask why Canada hasn't blocked international trade in 76 endangered species

    Critics ask why Canada hasn't blocked international trade in 76 endangered species
    Recently released documents indicate the federal government has reservations about restricting international trade in endangered species — more of them than almost any other government on Earth.

    Critics ask why Canada hasn't blocked international trade in 76 endangered species

    Premier Jim Prentice says low oil prices punch $6B-$7B hole in Alberta budget

    Premier Jim Prentice says low oil prices punch $6B-$7B hole in Alberta budget
    EDMONTON — Premier Jim Prentice says if oil prices continue to remain low, they will blow a $6 billion to $7 billion hole in the $40-billion provincial budget and no Albertan will be spared the pain.

    Premier Jim Prentice says low oil prices punch $6B-$7B hole in Alberta budget

    Safety Tips for a Safe Holiday Season

    Safety Tips for a Safe Holiday Season
    Surrey Fire Service is reminding residents to take extra safety precautions this winter in the wake of new data that shows fires are more likely to occur when the weather is cold.

    Safety Tips for a Safe Holiday Season

    Slain Vancouver-Born VH1 Star Asked Dance Teacher Not To Judge Rapper Husband

    Slain Vancouver-Born VH1 Star Asked Dance Teacher Not To Judge Rapper Husband
    Rachael Poirier says she asked Stephanie Moseley about her engagement ring when the actress on VH1's "Hit the Floor" drama series dropped by her old studio in Burnaby, B.C., three years ago.

    Slain Vancouver-Born VH1 Star Asked Dance Teacher Not To Judge Rapper Husband

    Harper partially disowns veterans charter as Opposition demands Fantino resign

    Harper partially disowns veterans charter as Opposition demands Fantino resign
    OTTAWA — The new veterans charter, a marquee deal defended and championed by Stephen Harper's Conservatives since 2006, suddenly became a "Liberal policy" Tuesday as the government weathered more demands for Julian Fantino's resignation.

    Harper partially disowns veterans charter as Opposition demands Fantino resign

    Little girl who met duchess Kate in 2011 dies after battle with cancer

    Little girl who met duchess Kate in 2011 dies after battle with cancer
    CALGARY — A young Alberta cancer patient whose timid embrace of the Duchess of Cambridge captured hearts around the world has died.

    Little girl who met duchess Kate in 2011 dies after battle with cancer