Saturday, May 23, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    From dark concrete to glass: National Arts Centre to get major facelift

    From dark concrete to glass: National Arts Centre to get major facelift
    OTTAWA — Nearly 50 years after the National Arts Centre was opened to celebrate Canada's centennial, it will undergo a major facelift to mark the country's 150th birthday.

    From dark concrete to glass: National Arts Centre to get major facelift

    Magnotta's lawyer asks jury to find his client not criminally responsible

    Magnotta's lawyer asks jury to find his client not criminally responsible
    MONTREAL — Luka Rocco Magnotta's lawyer has asked jurors to find his client not criminally responsible in the slaying and dismemberment of Jun Lin.

    Magnotta's lawyer asks jury to find his client not criminally responsible

    Oil tanker adrift off coast of Nova Scotia after loss of steering

    Oil tanker adrift off coast of Nova Scotia after loss of steering
    HALIFAX — An oil tanker is adrift off the coast of Nova Scotia due to a loss of steering.

    Oil tanker adrift off coast of Nova Scotia after loss of steering

    Rape, Referendum, Climate Change Among Topics Of B.C. Non-fiction Finalists

    Rape, Referendum, Climate Change Among Topics Of B.C. Non-fiction Finalists
    VANCOUVER — A first-person account of a rape, a look at the 1995 referendum and a study of climate change are among the finalists for the B.C. National Award for Canadian Non-Fiction, worth a whopping $40,000.

    Rape, Referendum, Climate Change Among Topics Of B.C. Non-fiction Finalists

    Hungry polar bear cubs shot after entering Nunavut town

    Hungry polar bear cubs shot after entering Nunavut town
    TALOYOAK, Nunavut — Residents in a remote Arctic hamlet are baffled by the number of hungry polar bear cubs that have wandered into their community since the fall and have had to be shot.

    Hungry polar bear cubs shot after entering Nunavut town

    Vancouver Places 30,000 Sandbags Along Waterfront In Anticipation Of King Tide

    Vancouver Places 30,000 Sandbags Along Waterfront In Anticipation Of King Tide
    VANCOUVER — Some 30,000 sandbags line a stretch of low-lying waterfront land in Vancouver, placed by city workers in a bid to protect local homes from an anticipated king tide.

    Vancouver Places 30,000 Sandbags Along Waterfront In Anticipation Of King Tide