Tuesday, December 23, 2025
ADVT 
National

City Shares Proposed Design For Granville Bridge Connector, Seeks Public Input In Final Phase Of Engagement

22 Jan, 2020 08:44 PM

    After receiving almost 8,000 survey responses from the public, City staff are recommending the “West Side Plus” design option for the Granville Bridge Connector.

     

    Starting January 24, the public will have the opportunity to share final feedback before a proposed design is presented to City Council for decision.


    “West Side Plus was by far the most popular option with the public during two previous rounds of engagement,” said Paul Storer, Manager of Transportation Design. “People also shared ideas, many of which we’ve been able to incorporate, for improving the design to ensure it offers the best possible experience for users.”


    West Side Plus features


    The proposed design for the West Side Plus option includes wide, accessible sidewalks on both sides of the main span of the bridge, and a two-way bike lane on the west side. It also includes safety improvements at ramp crossings, and improvements at each end of the bridge to link the Connector to the rest of the area’s walking and cycling network. The design leaves the bridge with enough capacity to accommodate transit vehicles and motorists.


    “As the City’s population grows and climate-change concerns intensify, the need to offer sustainable travel options has never been more important,” says Storer. “This project will give people more travel options to and from downtown that don’t contribute to congestion or pollution.”


    In 2016, 18,000 residents and 17,000 jobs were within a five-minute walk of Granville Bridge and 90,000 residents and 125,000 jobs were within a five-minute bike ride. Despite being a direct route to and from downtown, few people bike or use the bridge’s sidewalks because they feel unsafe and uncomfortable or because it’s not accessible.


    As the City grows, even more people will live and work within easy walking and cycling distance of the bridge. Once the Granville Bridge Connector is completed, all three False Creek bridges will offer safe and accessible options for walking, rolling, and biking to and from downtown.


    The proposed design represents a vision for the long-term configuration of the bridge and will cost $30-40 million, excluding means prevention fencing. Like many capital projects, the project would likely be delivered in phases and through partnerships.


    The City’s current capital budget includes $25 million for the Granville Bridge Connector. This spring, staff will present to Council a conceptual, phased budget for the project that will include the first phase of work that falls within the 2019-2022 capital budget.

    MORE National ARTICLES

    Accessibility Consultation Hears From Thousands Of British Columbians

    Accessibility Consultation Hears From Thousands Of British Columbians
    More than 6,300 people have shared their experiences and feedback on proposed accessibility legislation for B.C.

    Accessibility Consultation Hears From Thousands Of British Columbians

    Christmas Tree Cutting Permits Available

    Christmas Tree Cutting Permits Available
    British Columbians who want to cut their own Christmas tree can get a permit online, or by contacting their local natural resource district office or FrontCounter BC office.

    Christmas Tree Cutting Permits Available

    City Of Vancouver Says It's Ready For Ride-Hailing

    The City of Vancouver is ready to license ride-hailing companies so they can get on the road and serve residents, businesses, and visitors.   

    City Of Vancouver Says It's Ready For Ride-Hailing

    Surrey Roads Take A Technology Leap With New Advanced Traveller Information System

    The City of Surrey announced today the launch of its Advanced Traveller Information System (ATIS), which will help motorists make more informed decisions to improve their commute, reduce the environmental impact of driving, and lessen driver frustration.    

    Surrey Roads Take A Technology Leap With New Advanced Traveller Information System

    Surrey Mayor Doug McCallum And Head of Surrey RCMP Clashing Over The City’s New Budget - WATCH

    City council has passed a budget that places a freeze on the hiring of new RCMP officers and firefighters to help pay for the transition to a new municipal police service.

    Surrey Mayor Doug McCallum And Head of Surrey RCMP Clashing Over The City’s New Budget - WATCH

    NICHOLAS KHABRA MURDER: ‘Extremely Violent’ B.C. Fugitive Brandon Teixeira Arrested In Oroville, California By US Agencies

    THE Integrated Homicide Investigation Team are telling that Brandon Natahan Teixeira, 28, wanted for the October 2017 murder of Nicholas Khabra in Surrey, was arrested by SWAT in a small California community, Oroville, on Sunday

    NICHOLAS KHABRA MURDER: ‘Extremely Violent’ B.C. Fugitive Brandon Teixeira Arrested In Oroville, California By US Agencies