Tuesday, December 23, 2025
ADVT 
National

City Shares Proposed Design For Granville Bridge Connector, Seeks Public Input In Final Phase Of Engagement

22 Jan, 2020 08:44 PM

    After receiving almost 8,000 survey responses from the public, City staff are recommending the “West Side Plus” design option for the Granville Bridge Connector.

     

    Starting January 24, the public will have the opportunity to share final feedback before a proposed design is presented to City Council for decision.


    “West Side Plus was by far the most popular option with the public during two previous rounds of engagement,” said Paul Storer, Manager of Transportation Design. “People also shared ideas, many of which we’ve been able to incorporate, for improving the design to ensure it offers the best possible experience for users.”


    West Side Plus features


    The proposed design for the West Side Plus option includes wide, accessible sidewalks on both sides of the main span of the bridge, and a two-way bike lane on the west side. It also includes safety improvements at ramp crossings, and improvements at each end of the bridge to link the Connector to the rest of the area’s walking and cycling network. The design leaves the bridge with enough capacity to accommodate transit vehicles and motorists.


    “As the City’s population grows and climate-change concerns intensify, the need to offer sustainable travel options has never been more important,” says Storer. “This project will give people more travel options to and from downtown that don’t contribute to congestion or pollution.”


    In 2016, 18,000 residents and 17,000 jobs were within a five-minute walk of Granville Bridge and 90,000 residents and 125,000 jobs were within a five-minute bike ride. Despite being a direct route to and from downtown, few people bike or use the bridge’s sidewalks because they feel unsafe and uncomfortable or because it’s not accessible.


    As the City grows, even more people will live and work within easy walking and cycling distance of the bridge. Once the Granville Bridge Connector is completed, all three False Creek bridges will offer safe and accessible options for walking, rolling, and biking to and from downtown.


    The proposed design represents a vision for the long-term configuration of the bridge and will cost $30-40 million, excluding means prevention fencing. Like many capital projects, the project would likely be delivered in phases and through partnerships.


    The City’s current capital budget includes $25 million for the Granville Bridge Connector. This spring, staff will present to Council a conceptual, phased budget for the project that will include the first phase of work that falls within the 2019-2022 capital budget.

    MORE National ARTICLES

    B.C. Sawmill Explosions Report Calls For More Investigative Independence

    A report reviewing responses by the British Columbia government and WorkSafeBC after two fatal sawmill explosions is calling for a more streamlined investigative process and news ways for workers to report safety concerns.

    B.C. Sawmill Explosions Report Calls For More Investigative Independence

    5-Car Crash In Port Coquitlam Started With Police Car Colliding With Another Vehicle: Police

    5-Car Crash In Port Coquitlam Started With Police Car Colliding With Another Vehicle: Police
    If anyone has dash camera footage or witnessed the collision first hand, please call the Coquitlam RCMP at 604-945-1550 and ask for Constable Bauldry of the Criminal Collision Investigation Team.

    5-Car Crash In Port Coquitlam Started With Police Car Colliding With Another Vehicle: Police

    VanDusen Festival Of Lights Set To Sparkle For 35th Year

    The enchanting VanDusen Festival of Lights (FOL) is set to sparkle for another holiday season. And tickets are selling fast.

    VanDusen Festival Of Lights Set To Sparkle For 35th Year

    B.C. Nears The End Of The AIDS Epidemic

    On the occasion of World AIDS Day on Dec. 1, 2019, British Columbia marks record-low cases of HIV and AIDS as the crisis transitions from epidemic to chronic disease management.

    B.C. Nears The End Of The AIDS Epidemic

    Let’s Go Skating! Robson Square Ice Rink Now Open

    Children of all ages, families and community members laced up their skates and hit the ice to celebrate the official opening of the 11th annual outdoor skating season at Robson Square.

    Let’s Go Skating! Robson Square Ice Rink Now Open

    New Law Protecting Whistleblowers Now In Force

    New Law Protecting Whistleblowers Now In Force
    Current and past government employees who bring forward concerns about serious wrongdoing or who come under investigation have more protection, as the Public Interest Disclosure Act (PIDA) comes into force.

    New Law Protecting Whistleblowers Now In Force