Friday, December 26, 2025
ADVT 
National

Coquihalla Highway to reopen tomorrow

Darpan News Desk BC Government, 18 Jan, 2022 01:29 PM
  • Coquihalla Highway to reopen tomorrow

On Wednesday, Jan. 19, 2022, the Coquihalla Highway (Highway 5) will reopen to regular vehicle traffic between Hope and Merritt.

This will be a much more convenient route for people who need to travel between the Lower Mainland and the Interior, and is another significant milestone in the province’s recovery from the devastating storms.

Temporary repairs to the Coquihalla are in place while the ministry plans permanent repairs to the damaged sections. This means travel-pattern changes and reduced speed limits, with the trip between Hope and Merritt taking about 45 minutes longer than normal. This is a high-mountain route that can experience adverse weather and rapidly changing conditions that could require closure with minimal notice.

Electric-vehicle (EV) charging stations at Britton Creek are still out of operation. The nearest EV charging stations are in Hope and Merritt. There will continue to be increased enforcement on this route to ensure drivers are obeying the traffic laws and driving according to conditions.

On Wednesday, Jan. 19, weight restrictions will be lifted from Highway 99 between Pemberton and Lillooet. However, drivers of large commercial vehicles are discouraged from using this route because of the challenging terrain. It is recommended that only experienced winter drivers travel this route. There is an increased avalanche risk through this corridor, so drivers should be prepared for delays and before travelling should check: DriveBC.ca

In the Fraser Canyon, Highway 1 has partially reopened from Kanaka Bar south of Lytton to Spences Bridge. Drivers can expect delays on this section of Highway 1.

Highway 1 between Kanaka Bar and Hope remains closed. Record snowfalls and recent avalanche risks had delayed work around Jackass Mountain. However, crews are back on site and it is expected the highway will reopen to all vehicle traffic before the end of January.

When Highway 1 in the Fraser Canyon reopens, drivers can expect lengthy delays with additional travel times as long as two hours or longer, depending on the destination. Delays are a result of ongoing repairs, an at-grade train crossing, avalanche control and sections of single-lane alternating traffic, which includes a temporary single-lane bridge at the Jackass Mountain and Nicomen River crossing.

The highway will be open to legal width and weight loading, but loads will be limited to 25 metres in length until the rehabilitation of the highway bridge at Nicomen River is completed.

Drivers are reminded that B.C.’s winter-tire and chain-up regulations are in effect. Other safety tips for winter driving include travelling with a full tank of gas, food and water, and warm clothes. 

MORE National ARTICLES

Sarnia mayor welcomes U.S. land border reopening

Sarnia mayor welcomes U.S. land border reopening
Sarnia Mayor Mike Bradley said Wednesday that he believes Canadians will be cautious about driving south for day trips given that some parts of the U.S. have looser public health measures and higher COVID-19 case counts — a concern he said also emerged when Canada eased its border restrictions for Americans earlier this year.

Sarnia mayor welcomes U.S. land border reopening

Canada's antisemitism envoy to be permanent: PM

Canada's antisemitism envoy to be permanent: PM
Prime Minister Justin Trudeau is making the announcement today in a virtual appearance at the Malmö International Forum on Holocaust Remembrance and Combatting Antisemitism.

Canada's antisemitism envoy to be permanent: PM

West Fraser to buy U.S. sawmill for US$300 million

West Fraser to buy U.S. sawmill for US$300 million
The purchase from Angelina Forest Products will be funded with cash on hand and is expected to close after receiving U.S. regulatory approvals. The Vancouver-based company will provide further details about the transaction during its third-quarter earnings call on Oct. 28.

West Fraser to buy U.S. sawmill for US$300 million

Former homeless site in Vancouver open to public

Former homeless site in Vancouver open to public
The east side of the park was closed in May to allow remediation work after hundreds of campers were moved to indoor housing. The campers moved to Strathcona after being forced out of two other city parks.

Former homeless site in Vancouver open to public

Trudeau joins G20 in pushing Taliban to allow aid

Trudeau joins G20 in pushing Taliban to allow aid
During a virtual summit, Prime Minister Justin Trudeau and his fellow G20 leaders discussed the crisis in Afghanistan created by the Taliban rout of Kabul's Western-backed government.    

Trudeau joins G20 in pushing Taliban to allow aid

2,090 COVID19 cases over 4 days

2,090 COVID19 cases over 4 days
There are 5,183 active cases of COVID-19 in the province and 186,955 people who tested positive have recovered. Of the active cases, 357 individuals are in hospital and 153 are in intensive care. The remaining people are recovering at home in self-isolation.

2,090 COVID19 cases over 4 days