Wednesday, December 24, 2025
ADVT 
National

Coquihalla Highway to reopen tomorrow

Darpan News Desk BC Government, 18 Jan, 2022 01:29 PM
  • Coquihalla Highway to reopen tomorrow

On Wednesday, Jan. 19, 2022, the Coquihalla Highway (Highway 5) will reopen to regular vehicle traffic between Hope and Merritt.

This will be a much more convenient route for people who need to travel between the Lower Mainland and the Interior, and is another significant milestone in the province’s recovery from the devastating storms.

Temporary repairs to the Coquihalla are in place while the ministry plans permanent repairs to the damaged sections. This means travel-pattern changes and reduced speed limits, with the trip between Hope and Merritt taking about 45 minutes longer than normal. This is a high-mountain route that can experience adverse weather and rapidly changing conditions that could require closure with minimal notice.

Electric-vehicle (EV) charging stations at Britton Creek are still out of operation. The nearest EV charging stations are in Hope and Merritt. There will continue to be increased enforcement on this route to ensure drivers are obeying the traffic laws and driving according to conditions.

On Wednesday, Jan. 19, weight restrictions will be lifted from Highway 99 between Pemberton and Lillooet. However, drivers of large commercial vehicles are discouraged from using this route because of the challenging terrain. It is recommended that only experienced winter drivers travel this route. There is an increased avalanche risk through this corridor, so drivers should be prepared for delays and before travelling should check: DriveBC.ca

In the Fraser Canyon, Highway 1 has partially reopened from Kanaka Bar south of Lytton to Spences Bridge. Drivers can expect delays on this section of Highway 1.

Highway 1 between Kanaka Bar and Hope remains closed. Record snowfalls and recent avalanche risks had delayed work around Jackass Mountain. However, crews are back on site and it is expected the highway will reopen to all vehicle traffic before the end of January.

When Highway 1 in the Fraser Canyon reopens, drivers can expect lengthy delays with additional travel times as long as two hours or longer, depending on the destination. Delays are a result of ongoing repairs, an at-grade train crossing, avalanche control and sections of single-lane alternating traffic, which includes a temporary single-lane bridge at the Jackass Mountain and Nicomen River crossing.

The highway will be open to legal width and weight loading, but loads will be limited to 25 metres in length until the rehabilitation of the highway bridge at Nicomen River is completed.

Drivers are reminded that B.C.’s winter-tire and chain-up regulations are in effect. Other safety tips for winter driving include travelling with a full tank of gas, food and water, and warm clothes. 

MORE National ARTICLES

Freeland: Feds can help with jobs market mismatch

Freeland: Feds can help with jobs market mismatch
Although the country has recovered the three million jobs lost at the onset of the pandemic last year, the ranks of Canada's long-term unemployed remains well above pre-pandemic levels, and many people, particularly women, have dropped out of the labour force altogether.

Freeland: Feds can help with jobs market mismatch

Green cars, shipping on tap for Canada in Glasgow

Green cars, shipping on tap for Canada in Glasgow
Transport Minister Omar Alghabra also signed Canada on to a zero-emission car accord, an international aviation emissions promise and an agreement to make heavy trucks and buses emission-free in less tha

Green cars, shipping on tap for Canada in Glasgow

BC Housing Market at Historically Low Level of Supply

BC Housing Market at Historically Low Level of Supply
Total active residential listings were down nearly 40 per cent year-over-year in October, falling to an all-time record low for the province. Active listings have now fallen for five consecutive months on a seasonally adjusted basis.

BC Housing Market at Historically Low Level of Supply

As of January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated

As of January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated
At Monday’s regular Council meeting, Surrey City Council adopted the same vaccination requirements that have been introduced for City staff. Effective January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated and provide proof of vaccination to the City.    

As of January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated

Seeking witnesses to pedestrian hit and run: Richmond RCMP

Seeking witnesses to pedestrian hit and run: Richmond RCMP
According to the pedestrian, as he crossed Bridgeport Rd at Simpson Rd a vehicle allegedly pulled out of a parking lot, striking him, which resulted in him falling to the ground. The pedestrian did not get a good look at the vehicle, however, a witness described the vehicle as a gray SUV.

Seeking witnesses to pedestrian hit and run: Richmond RCMP

Fatal collision in Langley claims the life of a 17 year old

Fatal collision in Langley claims the life of a 17 year old
The driver and lone occupant, a 17-year-old male from Langley, did not survive the collision. His family has been advised of his passing.    

Fatal collision in Langley claims the life of a 17 year old