Friday, June 19, 2026
ADVT 
National

Massive Vancouver blaze that likely caused crane collapse is contained: Fire service

Darpan News Desk The Canadian Press, 07 Aug, 2024 09:49 AM
  • Massive Vancouver blaze that likely caused crane collapse is contained: Fire service

A fire in Vancouver destroyed an apartment building under construction, damaged nine other nearby homes and involved the collapse of a construction crane, the city's fire department said.

The flames in the city's Dunbar neighbourhood broke out at about 6:30 p.m. Tuesday and Vancouver Fire Rescue Service said burning embers set off the additional fires, forcing people out of their homes and creating "excessive smoke" in the area of southwest Vancouver. 

Keith Stewart, the department's assistant chief, said in an interview that two of the nine homes have been left uninhabitable, while the rest suffered minor damage.

A statement from the department said roads in the area remain closed to traffic and the crane will take time to clear. 

"There are currently no active fires. Firefighters continue to remain on-site to monitor remaining hot spots," the statement said. 

Video posted on social media while the fire was raging shows the crane toppling as a column of thick, black smoke billowed into the sky.

It was the second major fire in Vancouver on Tuesday, after flames broke out at a vacant apartment building that is slated for demolition. The service said the fire along East 10th Avenue began at about 4:30 p.m., and the city's chief building official has ordered the building to be torn down with work starting in the coming days.

Mayor Ken Sim said during an unrelated news conference that the two fires around the same time stretched the department's resources "incredibly thin."

He said his heart goes out to all those who are affected by the fire. 

Stewart said the cause of the fire at the Dunbar site and the circumstances that led to the crane collapsing are under investigation.

A couple of firefighters suffered minor injuries battling the blazes, he said.

A statement from the fire service said residents around the fire aren't yet allowed to return to their homes.

The City of Vancouver has directed displaced residents to Crofton House School at 3200 West 41st Ave., saying city staff were on site to provide assistance.

People outside that block of houses have been allowed to return home, though the fire service said BC Hydro was still working to restore power to some customers.

The statement from the service continued to advise that people with underlying breathing conditions find a safe indoor space.

MORE National ARTICLES

Plane crash in Surrey on 152nd St, pilot hurt and road closures in effect

Plane crash in Surrey on 152nd St, pilot hurt and road closures in effect
152 Street between 72 Avenue and 68 Avenue has been closed in both directions to all traffic. Police are requesting people plan ahead, avoid the area and use alternate routes. It is unknown how long the closures will remain in effect.

Plane crash in Surrey on 152nd St, pilot hurt and road closures in effect

Gun and a jerry can full of gasoline located inside vehicle

Gun and a jerry can full of gasoline located inside vehicle
A 39-year-old man, believed to be the driver, who is known to police was transported to Surrey RCMP cells and held in custody. Investigators confirmed that the vehicle was stolen from Coquitlam in November 2022.  

Gun and a jerry can full of gasoline located inside vehicle

Two teens charged in Prince George drug bust

Two teens charged in Prince George drug bust
Mounties say officers seized a firearm as well as 1.5 kilograms of suspected methamphetamine, fentanyl and cocaine from a home while executing a search warrant last Friday.

Two teens charged in Prince George drug bust

Surrey Drive Thru Arrest

Surrey Drive Thru Arrest
The man allegedly berated drive-thru staff in early February. Mounties say the man was arrested on May 24th and was charged with assault and causing a disturbance.

Surrey Drive Thru Arrest

B.C. giving $4.5 million to upgrade children's hospice facility

B.C. giving $4.5 million to upgrade children's hospice facility
Health Minister Adrian Dix says the funding will go toward structural repairs, enhancing patient care rooms, improving ventilation and making it more accessible. The minister says construction is expected to be complete by 2025.

B.C. giving $4.5 million to upgrade children's hospice facility

2 injured in shooting, 8 arrested: VPD

2 injured in shooting, 8 arrested: VPD
Witnesses called 9-1-1 reporting shots fired near East Hastings and Columbia just before 4:30 p.m. VPD flooded the area and located a victim with gunshot wounds, while several people were seen fleeing the area on foot. Eight people were arrested and have since been released pending further investigation.

2 injured in shooting, 8 arrested: VPD