Tuesday, May 12, 2026
ADVT 
National

Miller to propose more changes to immigration and asylum system

Darpan News Desk The Canadian Press, 25 Nov, 2024 03:09 PM
  • Miller to propose more changes to immigration and asylum system
 

Immigration Minister Marc Miller says further reforms to Canada's immigration and asylum systems will be proposed in the coming weeks. 

This comes on the heels of a significant cut to the amount of permanent residents being admitted to Canada in two years, and the tightening of rules around temporary worker permits. 

Statistics provided by Canadian officials show the average wait time to process refugee and asylum claims is around 44 months.

Miller tells the House of Commons immigration committee that the asylum and refugee system is not working the way it should due to volume and inefficiency. 

The minister said that this result is not unsurprising, as he says more people are being counselled to file asylum claims where he doesn't think they should have the ability to do so.

There were nearly 250,000 refugee claims that need to be decided as of the end of September and at the time 48,000 asylum claims had been processed since the beginning of this year.

MORE National ARTICLES

Massive Vancouver blaze that likely caused crane collapse is contained: Fire service

Massive Vancouver blaze that likely caused crane collapse is contained: Fire service
Vancouver Fire and Rescue Services says it has extinguished a blaze that destroyed an apartment building under construction, damaged nine nearby homes and appears to have caused a crane to collapse. The fire in Vancouver's west side broke out late Tuesday in a six-story building and spread to several nearby houses. 

Massive Vancouver blaze that likely caused crane collapse is contained: Fire service

Audit of BC Timber Sales program finds issues with road and bridge maintenance

Audit of BC Timber Sales program finds issues with road and bridge maintenance
The Forest Practices Board says an audit of the BC Timber Sales program and timber sales license holders in the Boundary region found "significant issues" with road and bridge maintenance. It says the board conducted a "full scope compliance audit" of all activities between June 2022 and June 2023 in the Kootenay Business Area in south-central B.C. along Highway 3.

Audit of BC Timber Sales program finds issues with road and bridge maintenance

B.C. to see a return to seasonable temperatures, but wildfire risk remains

B.C. to see a return to seasonable temperatures, but wildfire risk remains
The director of provincial operations for the BC Wildfire Service says the province has seen about 10,000 lightning strikes over the last seven days, primarily in the Kamloops Fire Centre and Southeast Fire Centres. Cliff Chapman says because B.C. had a hot and dry July, those lightning strikes have the ability and the fuel to start new fires.

B.C. to see a return to seasonable temperatures, but wildfire risk remains

Highway 1 shuts down in Chilliwack after fatal collision

Highway 1 shuts down in Chilliwack after fatal collision
On Tuesday at approximately 2:45 pm, BC Highway Patrol (BCHP) and Chilliwack RCMP responded to a multi-vehicle incident on Highway 1 near Yale Road West in Chilliwack. The highway has been shut down eastbound and currently has a single lane open westbound.

Highway 1 shuts down in Chilliwack after fatal collision

Man arrested in Airbnb break and enter

Man arrested in Airbnb break and enter
Mounties in North Vancouver say they have arrested a man for the breaking and entering of an Airbnb last month. They say a family from the United States had been unloading their car at the property and had left the rear door of the home open.

Man arrested in Airbnb break and enter

Plane modifications not properly recorded before B.C. crash: Safety board

Plane modifications not properly recorded before B.C. crash: Safety board
The Transportation Safety Board says a plane that crashed last year in Campbell River, B.C., was modified improperly after getting flight permits. The board's report on the September 2023 crash says the plane took off from Campbell River Airport with two pilots aboard who were involved in the development of a prototype aircraft with Sealand Aviation Ltd.

Plane modifications not properly recorded before B.C. crash: Safety board