Monday, June 29, 2026
ADVT 
National

Province Provides $550,000 For Flood Mitigation In Delta

Darpan News Desk Darpan, 22 Jun, 2016 12:35 PM
    As part of the public safety funding announced in February 2016, the Province is committing $550,000 in funding toward a flood mitigation project in Delta that will reduce the risk of property damage.
     
    Scott Hamilton, MLA for Delta North made the announcement today on behalf of Minister Naomi Yamamoto, Minister of State for Emergency Preparedness.
     
    The $825,000 project includes a $275,000 contribution from the Corporation of Delta. The combined funding will help Delta upgrade the foreshore and seawall protecting over 2,000 residents in areas that have been hit by frequent flooding.
     
    Delta is embarking on two projects that will mitigate flood risk arising from high tides, storm surges and wind driven waves. In the Beach Grove area the city will replace a section of deteriorating seawall that has developed large cracks.  
     
    The second area targeted for mitigation is a 450 metre section of dike in Boundary Bay at the southern end of 96th Street, where the city will install large rip rap material to minimize debris deposits and damage from storms.
     
    In February 2016 the B.C. government announced $65 million to help keep communities safe, including $15 million for public safety preparedness and $50 million for community hazard-mitigation projects, such as upgrades to dikes and flood protection.
     
    Since 2008, the Province has invested in 156 projects worth $145 million total ($62 million provided provincially, $46 million federally, and $37 million in funding from local authorities).
     
     
     
    Quick Facts:
     
    A storm in February 2006 topped the high water level mark on the beach and sea water was carried through Delta’s beach accesses and private front properties on to Centennial Parkway. 
     
    Delta’s storm and sanitary sewers were overwhelmed and public and private property damage resulted. Waves carrying large amounts of woody debris caused erosion to the dike in East Delta. The storm and resulting damage was so severe that the council declared a state of emergency and Delta’s Emergency Operations Centre was activated.
     
    The Beach Grove project is to be complete by the end of September 2016 and the Boundary Bay project by the end of April 2017.
    Both Beach Grove and Boundary Bay areas are at risk of flooding from high tides and storms.
     
    In 2014 the area was put in a state of emergency when a combination of high winds and tides battered the shores, causing localized flooding and the collapse of a private seawall.

    MORE National ARTICLES

    Cape Breton Man Convicted Of Thrill Killing Must Serve 15 Years Before Parole

    Cape Breton Man Convicted Of Thrill Killing Must Serve 15 Years Before Parole
    SYDNEY, N.S. — A Cape Breton man convicted in the second-degree murder of a 19-year-old woman has been sentenced to life in prison with no possibility of parole for 15 years.

    Cape Breton Man Convicted Of Thrill Killing Must Serve 15 Years Before Parole

    Saskatchewan Man Who Struck, Killed Conservation Officer Appeals Sentence

    Saskatchewan Man Who Struck, Killed Conservation Officer Appeals Sentence
    REGINA — A man who struck and killed a Saskatchewan conservation officer is to have the appeal of his sentence heard on Thursday.

    Saskatchewan Man Who Struck, Killed Conservation Officer Appeals Sentence

    Seventeen Schools In Cape Breton Facing Closure By 2021: School Board

    Seventeen Schools In Cape Breton Facing Closure By 2021: School Board
    The Cape Breton-Victoria Regional School Board presented the closure list Tuesday after spending months reviewing schools in the region.

    Seventeen Schools In Cape Breton Facing Closure By 2021: School Board

    Protest Held At Winnipeg Radio Station Over Videos Described As Racist, Sexist

    Protest Held At Winnipeg Radio Station Over Videos Described As Racist, Sexist
    The station, 92 CITI-FM, issued an apology on air Tuesday and said morning radio host Dave Wheeler had been suspended over the videos, which were posted Monday.

    Protest Held At Winnipeg Radio Station Over Videos Described As Racist, Sexist

    Suspect Travis Vader Late Again For Murder Trial In Missing Couple Case

    A lawyer for Travis Vader says his client was a half-hour behind this morning because a vehicle he was using was borrowed by someone and not returned.

    Suspect Travis Vader Late Again For Murder Trial In Missing Couple Case

    Quebec City Cop Facing Charge From Accident That Killed Motorcyclist

    Isabelle Morin has been charged in connection with an incident on Highway 73, the Crown said Tuesday.

    Quebec City Cop Facing Charge From Accident That Killed Motorcyclist