Thursday, June 18, 2026
ADVT 
National

'Road Zipper' To Bring Rush-hour Relief For Alex Fraser Bridge Commuters

Darpan News Desk, 13 Dec, 2019 10:27 PM

    Unique to Western Canada, a moveable barrier system with a zipper truck is about to make its debut on the Alex Fraser Bridge to make this key crossing safer and faster for commuters.


    This innovative type of counterflow improves capacity on the bridge and eliminates potential for cross-over collisions during counterflow, as traffic is continually separated by barriers. The system is in the testing phase and expected to be in place for drivers sometime in mid-December 2019.


    “The Alex Fraser Bridge project shows how we are working closely with our partners to build the modern transportation infrastructure needed to keep people safe and support long-term economic growth,” said Catherine McKenna, federal Minister of Infrastructure and Communities. “Together, we are helping communities make positive changes to improve people’s lives, keep our businesses competitive and reduce carbon emissions for our children and grandchildren.”


    Ravi Kahlon, MLA for Delta-North, on behalf of Claire Trevena, B.C.’s Minister of Transportation and Infrastructure, hosted a preview of the zipper truck in action near the weigh scale at Nordel Way on Dec. 12, 2019.


    “I’m thrilled to welcome the zipper system to the Alex Fraser Bridge, which will create an additional lane during peak times and keep drivers protected by barriers,” said Kahlon. “It will make a noticeable and positive difference for about 120,000 people who drive across the Alex Fraser Bridge every day, getting people to work and back home to their families more quickly and reliably.”


    The extra lane will be in place for northbound traffic every weekday from 4:30 a.m. to 11:30 a.m. to help ensure a more efficient and consistent travel time during the morning commute. Outside of these hours, the fourth lane will be open to ease congestion for southbound traffic.


    Upgrades for cyclists and pedestrians include new wayfinding signs, better access via the Cliveden Avenue interchange, widening narrow sections of sidewalk on the bridge and improving the Cliveden and Nordel pathways.


    Previously completed work includes:


    strengthening the bridge to accommodate the additional weight of another lane of traffic (repairing the main span deck, modifying expansion joints and stiffening girders);


    creating a seventh lane to the bridge by removing the shoulders and reconfiguring the pre-existing six lanes from 3.7 metres to 3.55 metres wide;


    adding additional lanes southbound on Highway 91 between Nordel Way and 72nd Avenue; and


    upgrading the Cliveden Avenue and Nordel Way interchanges, including a new signal for traffic accessing the Alex Fraser Bridge northbound from Nordel Way.


    The South of Fraser Advance Traveller Information System portion of the project is ongoing and expected to be finished in spring 2020.

    Thirteen new dynamic message signs are being installed that will predict the estimated travel time on four major Fraser River crossings — Alex Fraser Bridge, Port Mann Bridge, Pattullo Bridge and the George Massey Tunnel. Signs allowing drivers to choose their best route will be located along Highway 17, Highway 1, Highway 10, Marine Way and Knight Street.


    Quick Facts:


    To help keep travellers safe and traffic flowing efficiently as part of the counterflow operations, the speed limit on the Alex Fraser Bridge has been permanently lowered from 90 km/h to 70 km/h.


    The $70-million Alex Fraser Bridge capacity-improvement project is funded by the Government of Canada (more than $32.7 million) and the Province of B.C. (more than $37.3 million).

    MORE National ARTICLES

    One Man Hospitalized After Homeless Camp Stabbing In Abbotsford

    One Man Hospitalized After Homeless Camp Stabbing In Abbotsford
    On July 28, 2019 around 11:00pm, Abbotsford Police responded to an altercation between two people at a homeless camp on Gladys Ave.

    One Man Hospitalized After Homeless Camp Stabbing In Abbotsford

    HAVE YOU SEEN HER? Surrey RCMP Searching For Missing 12-Year-Old Abigail Scott

    She Has Not Been Seen Since 9 A.m. On July 11 In The 17000-block 64th Avenue In Surrey.  

    HAVE YOU SEEN HER? Surrey RCMP Searching For Missing 12-Year-Old Abigail Scott

    Latest Round In Northern Manitoba Hunt For B.C. Murder Suspects Proves Fruitless

    Latest Round In Northern Manitoba Hunt For B.C. Murder Suspects Proves Fruitless
     A massive police manhunt for two British Columbia homicide suspects has ended without success in a remote Indigenous community in northern Manitoba.

    Latest Round In Northern Manitoba Hunt For B.C. Murder Suspects Proves Fruitless

    Surrey RCMP Ask For Public's Help Identifying Suspect In Groping

    Suspect Described As A South Asian Man, Approximately 30 Years Old, With A Medium Build. Do You Know Him?

    Surrey RCMP Ask For Public's Help Identifying Suspect In Groping

    'Stay Inside': York Landing, Manitoba Residents Warned As Manhunt For B.C. Murder Suspects Intensifies

    Officers searched the York Landing area throughout the night and continue their efforts today. The Royal Canadian Air Force is also assisting today with the search.

    'Stay Inside': York Landing, Manitoba Residents Warned As Manhunt For B.C. Murder Suspects Intensifies

    Car Crash Knocked Out Power For 2000 People In Surrey And North Delta

    Car Crash Knocked Out Power For 2000 People In Surrey And North Delta
    Surrey RCMP is advising the public of a road closure following a motor vehicle collision that occurred on July 25th, 2019 in Surrey.

    Car Crash Knocked Out Power For 2000 People In Surrey And North Delta