Sunday, June 21, 2026
ADVT 
National

Thousands In Southern Bc Still Without Power Following Massive Windstorm

Darpan News Desk The Canadian Press, 11 Feb, 2019 06:31 PM
  • Thousands In Southern Bc Still Without Power Following Massive Windstorm

VANCOUVER — More than 11,000 customers were still without power in British Columbia on Sunday following a windstorm.


BC Hydro says that at one point on Saturday, the storm knocked out power to more than 70,000 customers.


The hardest hit areas were in the Lower Mainland and Sunshine Coast, along with southern Vancouver Island.


Environment Canada issued a snowfall warning for Metro Vancouver on Sunday afternoon.


The national forecaster expected about five to 10 centimetres in the region beginning in the afternoon.


The weather agency also has snowfall warnings of five to 10 centimetres for east and inland Vancouver Island, Greater Victoria and the southern Gulf Islands.


It also warns of strong winds in Squamish and Whistler as cold Arctic air surges through the mainland inlets and valleys of the B.C. coast.

MORE National ARTICLES

19-Year-Old Man Shot Dead In Abbotsford

On Monday, November 12, 2018, at 3:30 pm, Abbotsford emergency services were called to the intersection of Simpson Rd and Ross Rd for reports of a shooting.

19-Year-Old Man Shot Dead In Abbotsford

RCMP Blasts Surrey Mayor Doug McCallum For Using Fatal Shooting Of 22-Yr-Old To Make Political Point

RCMP Deputy Commissioner Brenda Butterworth-Carr, Commanding Officer of the BC RCMP, is criticizing Surrey Mayor Doug McCallum’s media release on Friday’s deadly shooting in the 14200-block of 70A Avenue in Surrey.

RCMP Blasts Surrey Mayor Doug McCallum For Using Fatal Shooting Of 22-Yr-Old To Make Political Point

U.S. Judge Blocks Construction Of $10-Billion Keystone XL Pipeline

U.S. Judge Blocks Construction Of $10-Billion Keystone XL Pipeline
GREAT FALLS, Mont. — TransCanada's $10-billion Keystone XL pipeline project has suffered another setback after a U.S. federal judge blocked its construction to allow more time to study the potential environmental impact.

U.S. Judge Blocks Construction Of $10-Billion Keystone XL Pipeline

Keystone XL Setback Will Cost Canadian Industry 'Millions', Says Association

Keystone XL Setback Will Cost Canadian Industry 'Millions', Says Association
CALGARY — The Canadian oil industry reacted with frustration and bitterness Friday after a U.S. judge ordered a halt to the Keystone XL pipeline project until it passes further environmental review.

Keystone XL Setback Will Cost Canadian Industry 'Millions', Says Association

Andrew Scheer Should Have Booted Tony Clement From Caucus Right Away: Tory Consultant

Andrew Scheer Should Have Booted Tony Clement From Caucus Right Away: Tory Consultant
OTTAWA — Conservative Leader Andrew Scheer shouldn't have taken Tony Clement at his word that he'd only been involved in one improper online exchange, a prominent conservative political consultant says.

Andrew Scheer Should Have Booted Tony Clement From Caucus Right Away: Tory Consultant

Justin Trudeau's Trade Chops To Be Tested On 10-Day, Three Country Trip

Justin Trudeau's Trade Chops To Be Tested On 10-Day, Three Country Trip
OTTAWA — Prime Minister Justin Trudeau is setting off on a 10-day voyage across Europe and Asia to pursue his oft-stated goal of finding markets for Canadian goods and services beyond the United States.

Justin Trudeau's Trade Chops To Be Tested On 10-Day, Three Country Trip