Monday, December 29, 2025
ADVT 
National

TransCanada Says It Remains Fully Committed To Building Keystone XL

Darpan News Desk The Canadian Press, 09 Nov, 2016 11:30 AM
    CALGARY — TransCanada says it remains fully committed to building the controversial Keystone XL pipeline that U.S. President Barack Obama rejected last year.
     
    The pipeline company said Wednesday it's evaluating ways to engage the new administration elected yesterday on the potential benefits of the project.
     
    President-elect Donald Trump has said several times he is in favour of the Keystone XL pipeline, and invited TransCanada to reapply for approval as part of his platform.
     
     
    The Obama administration rejected the pipeline that would bring bitumen from Alberta's oilsands to U.S. Gulf Coast refineries last November because it was found not to be in the U.S. national interest.
     
    In response, TransCanada has filed for NAFTA arbitration on the pipeline and is seeking $15 billion in damages, claiming the rejection was arbitrary and politically driven.
     
    Prime Minister Justin Trudeau has supported the pipeline in the past, while interim Conservative leader Rona Ambrose urged Trudeau in a statement Wednesday to move quickly to push the project forward.

    MORE National ARTICLES

    Abbotsford Toddler Tumbles From Third-floor Window After Climbing Couch

    Abbotsford Toddler Tumbles From Third-floor Window After Climbing Couch
    Abbotsford police say a four year old broke both femurs after climbing onto a couch, pushing out a window screen and falling through.

    Abbotsford Toddler Tumbles From Third-floor Window After Climbing Couch

    Girl, 10 Critically Injured In Port Coquitlam, B.C. Black Bear Attack

    Girl, 10 Critically Injured In Port Coquitlam, B.C. Black Bear Attack
    A spokeswoman for the B.C. Ambulance Service described the child's injuries as critical.

    Girl, 10 Critically Injured In Port Coquitlam, B.C. Black Bear Attack

    Woman Dies In Fall At Sooke Potholes Regional Park, Near Victoria, B.C.

    Woman Dies In Fall At Sooke Potholes Regional Park, Near Victoria, B.C.
    Coroner Barb McLintock confirms the death occurred Saturday evening at Sooke Potholes Regional Park.

    Woman Dies In Fall At Sooke Potholes Regional Park, Near Victoria, B.C.

    U.S. Man Who Blackmailed Canadian Girl To Strip Online Gets 10 Years Prison Sentence

    U.S. Man Who Blackmailed Canadian Girl To Strip Online Gets 10 Years Prison Sentence
    TRENTON, N.J. — A New Jersey man who blackmailed a Canadian girl to strip nakedonline is going to prison.

    U.S. Man Who Blackmailed Canadian Girl To Strip Online Gets 10 Years Prison Sentence

    Body Of Winnipeg Man Missing Since Last Fall Found, Death Not Criminal: Police

    Body Of Winnipeg Man Missing Since Last Fall Found, Death Not Criminal: Police
    Investigators say they don't believe his death was related to anything criminal.

    Body Of Winnipeg Man Missing Since Last Fall Found, Death Not Criminal: Police

    President Pranab Mukherjee's Daughter Sharmistha Sexually Harassed On Facebook By This Pervert

    President Pranab Mukherjee's Daughter Sharmistha Sexually Harassed On Facebook By This Pervert
    President's daughter Sharmistha Mukherjee names and shames 'pervert' on Facebook

    President Pranab Mukherjee's Daughter Sharmistha Sexually Harassed On Facebook By This Pervert