Thursday, June 4, 2026
ADVT 
National

Vancouver doubles height for mass-timber development from six to twelve storeys

Darpan News Desk City of Vancouver, 05 Jun, 2020 12:04 AM
  • Vancouver doubles height for mass-timber development from six to twelve storeys

Amendments to the city's building bylaw approved by Council last week will allow mass timber construction up to 12 storeys for residential and commercial uses, doubling the current height limit of 6 storeys.

With changes taking effect on July 1, permitting taller mass timber construction within the Building By-law will make it easier to build with low carbon materials, support housing affordability, and remove barriers for the construction industry at a time of crisis and economic recovery.

Benefits of mass timber This move also represents an important first step in reducing our carbon pollution from construction. Mass timber is a natural low carbon material with good insulating properties, and is pre-manufactured off-site in large, modular pieces. The approved changes are one of the first priority actions under the Climate Emergency Response, reducing carbon pollution from construction materials and designs.

Benefits of building with mass timber include: Reducing the carbon pollution of construction by 25-45% or more Improving energy efficiency and insulation effectiveness Reducing construction time, cost, and community impact by using pre-manufactured pieces When sourced from regional forests and manufacturing plants, using mass timber can create jobs and support the local and regional economy in forestry and manufacturing Mass timber is significantly more fire resistant than light timber construction A resilient construction economy is a critical part of Vancouver’s recovery.

By making it easier to use mass timber construction in Vancouver and supporting investment in local and regional design, manufacturing, and construction of mass timber buildings, we can enable a pathway towards lower carbon, more affordable, and more resilient construction in Vancouver. This change is also part of a move nationally by the Canadian Commission on Building and Fire Codes. As part of the provincial process and update to the Vancouver Building By-law, a public comment period took place in October 2019. Those comments became part of the provincial changes that took effect in December 2019, and formed the basis for this increase.

The City’s Mass Timber Advisory Committee, a gender-balanced panel of eighteen local architects, contractors, engineers, developers, building science and code experts, shared strong support for Vancouver adopting this change.

MORE National ARTICLES

Man Charged In 2019 Crash That Killed Girl, 13, And Injured Two More Kids In Coquitlam

Almost one year after a collision that killed a 13-year-old Coquitlam girl, a single charge under the Motor Vehicle Act has been laid against one of the drivers involved in the crash.  

Man Charged In 2019 Crash That Killed Girl, 13, And Injured Two More Kids In Coquitlam

Trudeau Says Canada-U.S. Border Closure Likely To Take Effect Friday Night

Trudeau Says Canada-U.S. Border Closure Likely To Take Effect Friday Night
The Canada-U.S. border will likely be closed to all non-essential travel in both directions as of Friday night, says Prime Minister Justin Trudeau.

Trudeau Says Canada-U.S. Border Closure Likely To Take Effect Friday Night

Surrey RCMP: Missing 86-Year-Old South Asian Man GURNAM CHEEMA Located Deceased

Foul play is not suspected.

Surrey RCMP: Missing 86-Year-Old South Asian Man GURNAM CHEEMA Located Deceased

During Drug-Trafficking Investigation, Surrey RCMP Seize Drugs And Firearms From Three Residences

Surrey RCMP is informing the public of three search warrants for residences that have led to seizures of drugs and firearms.  

During Drug-Trafficking Investigation, Surrey RCMP Seize Drugs And Firearms From Three Residences

COVID 19: Here Are The Measures CFIB Is Taking On Behalf Of Small Business In Canada And What Can Be Done By You And Your Employees To Prepare

- If the quarantine is driven by the employee (ie. they have no symptoms, have not traveled out of country, but do not wish to come to work); they will not be able to collect EI. You will use ROE Code N – Leave of Absence    

COVID 19: Here Are The Measures CFIB Is Taking On Behalf Of Small Business In Canada And What Can Be Done By You And Your Employees To Prepare

Multiculturalism Grants Advance Anti-Racism

Communities throughout B.C. will be safer and more inclusive for people, with 75 projects supported through the latest round of BC Multiculturalism Grants.

Multiculturalism Grants Advance Anti-Racism