Sunday, June 21, 2026
ADVT 
National

Work Starts On Smoother Surfaces For Several Surrey Highways

Darpan News Desk Darpan, 28 Jun, 2016 02:30 PM
    Several stretches of highway in the Surrey area are about to get a new look as work begins on a $5.2 million highway rehabilitation project for highways 10, 15, 91 and 99.
     
    “As part of our commitment through B.C. on the Move, we are making sure we keep provincial highways, bridges and side roads in good condition, which is key to a safe and reliable transportation network,” said Transportation and Infrastructure Minister Todd Stone. “We are headed into another busy construction season with many projects underway in the Lower Mainland as this region continues to see growth in population and the economy.”
     
    The rehabilitation work contract was awarded to Lafarge Canada Inc. The work is scheduled to begin in early July with completion slated for September 2016. In total, 25 kilometres of highway will be resurfaced by milling/filling the existing pavement.
     
     
    Crews will resurface the following stretches of highway: 10 kilometres on the Pacific Highway (Highway 15) in the Samhill area, 10 kilometres on the Ladner-Langley Highway (Highway 10) in the Panorama area, 2 kilometres on the Richmond East/West Connector Highway (Highway 91) in the No. 6 Road area, and 3 kilometres on the Vancouver-Blaine Highway (Highway 99) in the 152nd Street area.
     
    “Surrey is one of the fastest growing communities in the province and it is vital to maintain our current roads and highways,” said Surrey-Cloverdale MLA Stephanie Cadieux. “It is part of our strategy to complement new infrastructure that will eventually improve traffic flow and relieve traffic congestion.”
     
     
    "Highway 91, a major freeway which connects Richmond, Delta and New Westminster, has become busier as the population of Richmond grows. I am glad that rehabilitation work can be done, which increases road safety and helps bring people back home safely," said Richmond East MLA Linda Reid.
     
    B.C. on the Move is government’s new 10-year plan for the improvement of the province’s transportation network. Over the next three years, the Ministry of Transportation and Infrastructure will invest up to $2.7 billion to improve B.C.’s transportation network.
     
    As part of this plan, the B.C. government will invest $380 million over three years to resurface provincial highways. 
     
     
    Highway resurfacing includes conventional paving, hot-in-place recycle paving (an environmentally-friendly, made-in-B.C. technology), and sealcoating for lower volume rural highways. This investment program is the main component of the government’s strategy to resurface 1,000 kilometres of provincial highway annually.

    MORE National ARTICLES

    TransCanada Shuts Down KeyStone Pipeline After Oil Spill In South Dakota

    TransCanada Shuts Down KeyStone Pipeline After Oil Spill In South Dakota
    The pipeline, which carries about 500,000 barrels of oil a day, was shut down in minutes

    TransCanada Shuts Down KeyStone Pipeline After Oil Spill In South Dakota

    Rental Housing Is For Residents, Says Vancouver Councillor Eyeing Airbnb Rules

    Rental Housing Is For Residents, Says Vancouver Councillor Eyeing Airbnb Rules
    Coun. Geoff Meggs wants to expand and accelerate a study already underway by city staff on the effect Airbnb and similar websites are having on the supply of rental housing.

    Rental Housing Is For Residents, Says Vancouver Councillor Eyeing Airbnb Rules

    Online Tool Educates Teachers To Help Kids Returning To School After Concussion

    Online Tool Educates Teachers To Help Kids Returning To School After Concussion
    Teachers across Canada can now get advice from a new program to help students returning to school after a concussion.

    Online Tool Educates Teachers To Help Kids Returning To School After Concussion

    B.C. Seniors-Care Facility Cuts Entire Staff Over Reports Of Chronic Underfunding

    B.C. Seniors-Care Facility Cuts Entire Staff Over Reports Of Chronic Underfunding
      More than 150 employees at Wexford Creek Care Home in Nanaimo, B.C., ranging from nurses to care aides, received pink slips on Friday.

    B.C. Seniors-Care Facility Cuts Entire Staff Over Reports Of Chronic Underfunding

    Transport Canada Report Raises Alarm Over Aging Coast Guard Fleet

    A report done for Transport Canada and quietly tabled in the House of Commons, paints a grim portrait of the country's coast guard fleet, saying it is understaffed, desperately in need of new ships 

    Transport Canada Report Raises Alarm Over Aging Coast Guard Fleet

    Manitoba Liberals Drop Candidate Kurt Berger Over 2002 Assault On Girlfriend

    Manitoba Liberals Drop Candidate Kurt Berger Over 2002 Assault On Girlfriend
    Rana Bokhari says Kurt Berger was upfront about his conviction when he applied to be a candidate.

    Manitoba Liberals Drop Candidate Kurt Berger Over 2002 Assault On Girlfriend