Thursday, July 2, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

V.G. Siddhartha Suicide: Saga Of A Coffee Baron's Brewing Success & Failure

I am solely responsible for all mistakes. Every financial transaction is my responsibility. My team, auditors and senior management are totally unaware of all my transactions. 

V.G. Siddhartha Suicide: Saga Of A Coffee Baron's Brewing Success & Failure

At Least 55 Govt Schools In Punjab Don't Have Any Teacher

At Least 55 Govt Schools In Punjab Don't Have Any Teacher
At least 55 government schools located along the border areas of Punjab have students, but no teachers.

At Least 55 Govt Schools In Punjab Don't Have Any Teacher

Over 1 Kg Heroin Worth Rs 7 Cr Seized From Woman In Punjab

Over 1 Kg Heroin Worth Rs 7 Cr Seized From Woman In Punjab
Over a kilogram of heroin with a street value of Rs 7 crore was seized from the possession of a 24-year-old woman here, police said on Wednesday.

Over 1 Kg Heroin Worth Rs 7 Cr Seized From Woman In Punjab

Capt Amarinder Singh Rejects Closure Report In Bargari Case By CBI, Demands Reopening Of Probe

Capt Amarinder Singh Rejects Closure Report In Bargari Case By CBI, Demands Reopening Of Probe
Punjab Chief Minister Captain Amarinder Singh, here on Wednesday, rejected the 'hurried' CBI closure report in the Bargari sacrilege case and demanded further investigations into the matter.    

Capt Amarinder Singh Rejects Closure Report In Bargari Case By CBI, Demands Reopening Of Probe

Bhojpuri Actor Alina Shaikh Alleges Husband Handed Triple Talaq In Instalments

The Triple Talaq Bill is yet to get the Presidential assent. But has Baig found a method to circumvent the law? The police have already told Alina they can't act against him yet.

Bhojpuri Actor Alina Shaikh Alleges Husband Handed Triple Talaq In Instalments

Porus Actor Mohit Abrol Accuses Ex-girlfriend Mansi Srivastava Of Cheating

After breaking up with actress Mansi Srivastava a few months ago, TV actor Mohit Abrol has now accused her of cheating on him with her former co-star Arhaan Behl.

Porus Actor Mohit Abrol Accuses Ex-girlfriend Mansi Srivastava Of Cheating