BC Hydro says it should have been more proactive as Site C costs overflowed

Darpan News Desk The Canadian Press, 04 Nov, 2025 10:00 AM
  • BC Hydro says it should have been more proactive as Site C costs overflowed

British Columbia's power utility says it should have been more proactive about ballooning costs on the massive Site C hydroelectric dam project, partly blaming a failure to budget for "low-probability, high-consequence risks."

BC Hydro says in a "lessons learned report" to the British Columbia Utilities Commission that it's on track to complete the project on the Peace River within a $16 billion budget.

But that's almost double the original 2014 budget of about $8.8 billion, which was increased twice, in 2018 and 2021.

BC Hydro blames the huge overrun on the pandemic, as well as a failure to budget for low-probability risks that included substantial geotechnical problems.

The utility says it should have "ramped up its internal project resources more proactively and sooner."

Site C is the third hydro dam on the Peace River in northeastern B.C. and it provides enough electricity to power about 450,000 homes every year. 

The 224-page report, submitted last Thursday, says future projects should better communicate the "breadth" of risks with the potential for significant impacts on budget and scheduling.

An executive summary says that "consistent with industry best practices" the methodology of the project’s cost-risk analysis meant that unlikely risks were excluded from the original budget. 

"Accordingly, the project contingency and project reserve were both insufficient to absorb the full costs when these high-consequence, low-probability risk events materialized."

It says that while the pandemic was "unforeseen," the potential geotechnical challenges were understood.

Enhancing the dam's right bank foundation accounted for $1.1 billion of the overall budget increase, left bank cracks accounted for $600 million, and construction delays caused by the COVID-19 pandemic accounted for $1.6 billion.

Further costs increases were related to contractor claims, redesigns, and other factors, it says. 

However, the report also says the challenges that sent the budget soaring were met with "ingenuity and determination."

"Overall, BC Hydro reflects on the Site C Project with pride and a commitment to learn and improve," the summary says.

Picture Courtesy: THE CANADIAN PRESS/Jonathan Hayward

MORE National ARTICLES

Court hears legal arguments in former world junior hockey players' sex assault case

Court hears legal arguments in former world junior hockey players' sex assault case
A London, Ont., court is hearing legal arguments today in the sex assault trial of five former members of Canada's worldjunior hockey team.

Court hears legal arguments in former world junior hockey players' sex assault case

Vancouver police look for witnesses after Sikh temple vandalized

Vancouver police look for witnesses after Sikh temple vandalized
Police in Vancouver are looking for witnesses after a Sikhtemple was vandalized over the weekend.

Vancouver police look for witnesses after Sikh temple vandalized

Energy efficient school in Coquitlam, B.C., gets clean energy designation

Energy efficient school in Coquitlam, B.C., gets clean energy designation
The Coast Salish Elementary school in Coquitlam, B.C., has been designated a Clean Energy Champion by BC Hydro for its energy efficiency. 

Energy efficient school in Coquitlam, B.C., gets clean energy designation

Advance poll turnout breaks record with 7.3M ballots cast, Elections Canada says

Advance poll turnout breaks record with 7.3M ballots cast, Elections Canada says
The waning days of the federal election campaign saw voters turn out in record numbers for advance polls and party leaders attempt to poke holes in each others' platforms.

Advance poll turnout breaks record with 7.3M ballots cast, Elections Canada says

Spring, icy snow bring danger to B.C. backcountry, outdoor experts say

Spring, icy snow bring danger to B.C. backcountry, outdoor experts say
Spring is a dangerous time to head into British Columbia's backcountry, outdoor experts warn, as sun and warm daytime temperatures melt snowpack that can become hard and treacherously slippery as it freezes again overnight.

Spring, icy snow bring danger to B.C. backcountry, outdoor experts say

Hikers scramble for alternatives after damage shuts B.C.'s popular Juan de Fuca Trail

Hikers scramble for alternatives after damage shuts B.C.'s popular Juan de Fuca Trail
Trish Fougner still remembers the taste of the beer she enjoyed after completing the 47-kilometre Juan de Fuca Trailon Vancouver Island two years ago.

Hikers scramble for alternatives after damage shuts B.C.'s popular Juan de Fuca Trail