Saturday, December 27, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    First international book fair starts in Toronto

    First international book fair starts in Toronto
    The first Inspire! Toronto International Book Fair (TIBF), which runs Nov 13-16 at the Metro Toronto Convention Centre here, will feature a panel of Canadian authors published in India....

    First international book fair starts in Toronto

    Two Canadian firms play small but key roles in historic landing on comet

    Two Canadian firms play small but key roles in historic landing on comet
    MONTREAL — Two Canadian companies were bursting with pride Wednesday after playing small but important roles in the historic landing of a spacecraft on the surface of a comet.

    Two Canadian firms play small but key roles in historic landing on comet

    Premier Robert Ghiz of P.E.I. to resign, does not rule out federal run

    Premier Robert Ghiz of P.E.I. to resign, does not rule out federal run
    CHARLOTTETOWN — Premier Robert Ghiz of Prince Edward Island says he plans to quit as premier, less than a year before the province's next election is scheduled, and he is not ruling out a possible federal run.

    Premier Robert Ghiz of P.E.I. to resign, does not rule out federal run

    Halifax child pornography sentencing hears victim impact statements from parents

    Halifax child pornography sentencing hears victim impact statements from parents
    HALIFAX — The parents of a teenage girl victimized in a prominent child pornography case in Halifax have delivered victim impact statements at a sentencing hearing for a young man who pleaded guilty.

    Halifax child pornography sentencing hears victim impact statements from parents

    Sewing needles now found in 10 potatoes from Prince Edward Island, RCMP say

    Sewing needles now found in 10 potatoes from Prince Edward Island, RCMP say
    CHARLOTTETOWN — The RCMP in Prince Edward Island say their investigation into food tampering now includes 10 potatoes containing sewing needles.

    Sewing needles now found in 10 potatoes from Prince Edward Island, RCMP say

    Sunken New Brunswick lobster boat made turn too close to sandbar: safety board

    Sunken New Brunswick lobster boat made turn too close to sandbar: safety board
    TABUSINTAC, NEW BRUNSWICK, Canada — The Transportation Safety Board says a New Brunswick lobster boat that sank last year, killing three men, turned too close to a sandbar in stormy weather before it began taking on water.

    Sunken New Brunswick lobster boat made turn too close to sandbar: safety board