Saturday, December 27, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Liberal Leader Justin Trudeau Calls Conservative Fiscal Update 'Unfair'

    Liberal Leader Justin Trudeau Calls Conservative Fiscal Update 'Unfair'
    Trudeau says the federal government chose to spend its budget surplus on tax breaks such as income splitting, which benefits only a very small number of Canadians.

    Liberal Leader Justin Trudeau Calls Conservative Fiscal Update 'Unfair'

    Lowering The Status Of Canada's Chief Doctor Worrying Public Health Community

    Lowering The Status Of Canada's Chief Doctor Worrying Public Health Community
    TORONTO — Members of Canada's public health community are expressing concern about intended changes to the authority of the country's chief public health officer, changes that strip the office holder of the responsibility of running the Public Health Agency of Canada.

    Lowering The Status Of Canada's Chief Doctor Worrying Public Health Community

    Kinder Morgan President Says B.C. Pipeline Projections Conservative

    Kinder Morgan President Says B.C. Pipeline Projections Conservative
    VICTORIA — Kinder Morgan's president says a study projecting a high rate of job creation in B.C. during the expansion of its Trans Mountain pipeline is based on fair and reasonable assumptions.

    Kinder Morgan President Says B.C. Pipeline Projections Conservative

    First Nations Launch Federal Court Challenge Of B.C.'s Site C Dam

    First Nations Launch Federal Court Challenge Of B.C.'s Site C Dam
    VANCOUVER — Four First Nation bands from northeastern B.C. have launched a Federal Court case over Ottawa's approval of the massive Site C hydroelectric dam.

    First Nations Launch Federal Court Challenge Of B.C.'s Site C Dam

    Wolves With High Hunting Threat Get Stressed Out, Face Social Disturbance

    Wolves With High Hunting Threat Get Stressed Out, Face Social Disturbance
    SIDNEY, B.C. — Wolves in areas where the animals are heavily hunted experience social disruption and psychological stress, says a new study.

    Wolves With High Hunting Threat Get Stressed Out, Face Social Disturbance

    Emma Paulsen Accused Of Killing 6 Dogs By Leaving Them In Hot Truck Pleads Guilty

    Emma Paulsen Accused Of Killing 6 Dogs By Leaving Them In Hot Truck Pleads Guilty
    SURREY, B.C. — A Vancouver-area dog walker accused of killing six dogs by leaving them in a hot truck has pleaded guilty to two charges — animal cruelty and mischief.

    Emma Paulsen Accused Of Killing 6 Dogs By Leaving Them In Hot Truck Pleads Guilty