Saturday, December 27, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Man Stabbed to Death in Vancouver Building Lobby, Richmond Man Arrested

    Man Stabbed to Death in Vancouver Building Lobby, Richmond Man Arrested
    Police were initially searching for the suspect after being called to a west side Vancouver apartment building around 6:30 a.m. on reports of a fight.

    Man Stabbed to Death in Vancouver Building Lobby, Richmond Man Arrested

    'Murder for lobster' case begins in Nova Scotia with Crown opening arguments

    'Murder for lobster' case begins in Nova Scotia with Crown opening arguments
    PORT HAWKESBURY, N.S. — A Cape Breton man was dragged out to sea with a gaff and tied to an aluminum anchor after he was shot and his boat was rammed three times, the Crown said as a murder trial got underway Thursday.

    'Murder for lobster' case begins in Nova Scotia with Crown opening arguments

    B.C. Man Accused Of Killing Girlfriend Using Hammers Begins Murder Trial

    B.C. Man Accused Of Killing Girlfriend Using Hammers Begins Murder Trial
    KAMLOOPS, B.C. — A Kamloops jury has viewed video of a man telling an undercover police officer that he bashed his girlfriend on the head upwards of 60 times with a mallet and sledgehammer before packing her body in a cooler.

    B.C. Man Accused Of Killing Girlfriend Using Hammers Begins Murder Trial

    Winnipeg teen beaten, sexually assaulted eager to return to school: mother

    Winnipeg teen beaten, sexually assaulted eager to return to school: mother
    WINNIPEG — The mother of a 16-year-old who was viciously attacked, sexually assaulted and left for dead in downtown Winnipeg says the teen is getting better and is anxious to return to school.

    Winnipeg teen beaten, sexually assaulted eager to return to school: mother

    Video Of A Vancouver Homeless Man Being Goaded Into Setting His Hair On Fire Sparks Outrage

    Video Of A Vancouver Homeless Man Being Goaded Into Setting His Hair On Fire Sparks Outrage
    VANCOUVER — An online video of a Vancouver homeless man being goaded into setting his hair on fire has sparked outrage, though police are not currently investigating the incident.

    Video Of A Vancouver Homeless Man Being Goaded Into Setting His Hair On Fire Sparks Outrage

    Small Magnets Found In Some Toy Sets A Health Risk To Children: Health Canada

    Small Magnets Found In Some Toy Sets A Health Risk To Children: Health Canada
    TORONTO — Health Canada is repeating its warning that toys containing small, powerful magnets are a health risk to children.

    Small Magnets Found In Some Toy Sets A Health Risk To Children: Health Canada