Monday, May 18, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Two people arrested in Ottawa mall shooting released without charge

    Two people arrested in Ottawa mall shooting released without charge
    OTTAWA — Two people arrested in connection with a Boxing Day shooting at a shopping mall in Ottawa`s west end have been released without charge.

    Two people arrested in Ottawa mall shooting released without charge

    Four men arrested after Christmas diners robbed of valuables while supping

    Four men arrested after Christmas diners robbed of valuables while supping
    VANCOUVER — A Christmas Day crime spree in Vancouver was concluded by police with the arrests of four men.

    Four men arrested after Christmas diners robbed of valuables while supping

    Replica gun recovered from scene where Alberta RCMP shot lone male

    Replica gun recovered from scene where Alberta RCMP shot lone male
    VEGREVILLE, Alta. — The investigation into a Christmas Day shooting by police in Alberta will be handled by the province's police watchdog.

    Replica gun recovered from scene where Alberta RCMP shot lone male

    One wounded in Ottawa shopping mall shooting but no 'active shooter': Police

    One wounded in Ottawa shopping mall shooting but no 'active shooter': Police
    OTTAWA — Boxing Day shoppers scrambled for safety as a shooter fired a single round in the outdoor area of an outlet mall in the national capital, sending one person to hospital with minor injuries in what police are treating as an isolated incident.

    One wounded in Ottawa shopping mall shooting but no 'active shooter': Police

    Rail cars carrying concrete ingredient and grains derail west of Banff

    Rail cars carrying concrete ingredient and grains derail west of Banff
    BANFF, Alta. — Officials with the Transportation Safety Board and other environment officials are at the scene of a CP Rail derailment near Banff.

    Rail cars carrying concrete ingredient and grains derail west of Banff

    List of additions and promotions in Order of Canada list for Dec. 26

    List of additions and promotions in Order of Canada list for Dec. 26
    Here is a list of the latest additions and promotions in the Order of Canada:

    List of additions and promotions in Order of Canada list for Dec. 26