Monday, May 18, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Ex-NHLer, child abuse advocate Sheldon Kennedy joins Order of Canada

    Ex-NHLer, child abuse advocate Sheldon Kennedy joins Order of Canada
    OTTAWA — Sheldon Kennedy says being the recipient of one of the country's top honours can serve as a beacon to lead countless other children out of the darkness of child abuse.

    Ex-NHLer, child abuse advocate Sheldon Kennedy joins Order of Canada

    New Brunswick Warns Of Possible Flooding

    New Brunswick Warns Of Possible Flooding
    FREDERICTON - New Brunswick's pubic safety department is warning residents to watch for high water levels and possible flooding over the next two days.

    New Brunswick Warns Of Possible Flooding

    Pepe the autism-support dog dramatically improves life for girl and family

    Pepe the autism-support dog dramatically improves life for girl and family
    WHITE ROCK, B.C. — Pepe, a chocolate Labrador retriever, pays very close attention when her 13-year-old owner Maya doles out dog goodies.

    Pepe the autism-support dog dramatically improves life for girl and family

    Malls open early as bargain hunters head out for Boxing Day shopping blitz

    Malls open early as bargain hunters head out for Boxing Day shopping blitz
    TORONTO — Bargain hunters will be on the prowl at malls today for Boxing Day sales.

    Malls open early as bargain hunters head out for Boxing Day shopping blitz

    A list of some Canadian newsmakers who died in 2014

    A list of some Canadian newsmakers who died in 2014
    A list of some Canadian newmakers who died in 2014:

    A list of some Canadian newsmakers who died in 2014

    Avalanche danger rising for B.C. backcountry, public warning issued

    Avalanche danger rising for B.C. backcountry, public warning issued
    REVELSTOKE, B.C. — Professional avalanche watchers in B.C. have issued a special public warning about a heightened potential for avalanches across a large swath of the province over the coming days.

    Avalanche danger rising for B.C. backcountry, public warning issued