Monday, May 18, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Two dead, vehicles engulfed in flames in B.C. Central Interior crash

    Two dead, vehicles engulfed in flames in B.C. Central Interior crash
    ASHCROFT, B.C. — Kamloops, B.C., Mounties say two people have been killed in a fiery head-on crash in the Central Interior.

    Two dead, vehicles engulfed in flames in B.C. Central Interior crash

    Giant Mine bomber, 71, granted extension on day parole after good behaviour

    A man who murdered nine people by bombing a Yellowknife mine 22 years ago continues to make "positive contributions to society" since being released from prison, a federal parole board has ruled in extending Roger Warren's day parole.

    Giant Mine bomber, 71, granted extension on day parole after good behaviour

    Surrey Carjacking Suspect Arrested After Woman's SUV Stolen With Baby Inside

    Surrey Carjacking Suspect Arrested After Woman's SUV Stolen With Baby Inside
    SURREY, B.C. — A 24-year-old man has been arrested in connection with a series of crimes that included the carjacking of a woman's SUV with her baby inside.

    Surrey Carjacking Suspect Arrested After Woman's SUV Stolen With Baby Inside

    Two Dead, Vehicles Engulfed In Flames In B.C. Central Interior Crash

    Two Dead, Vehicles Engulfed In Flames In B.C. Central Interior Crash
    Police say a pickup with two passengers inside veered into the wrong lane and collided with a tractor trailer, causing both vehicles to erupt in flames.

    Two Dead, Vehicles Engulfed In Flames In B.C. Central Interior Crash

    Justin Haevischer Accused Of Helping Surrey Six Killers Escape Arrested

    Justin Haevischer Accused Of Helping Surrey Six Killers Escape Arrested
    VANCOUVER — The brother of a man who was found guilty of first-degree murder in the so-called Surrey Six case remains in custody after his first court appearance.

    Justin Haevischer Accused Of Helping Surrey Six Killers Escape Arrested

    Police warn of powerful drug stolen from Vancouver pharmacy during armed robbery

    Police warn of powerful drug stolen from Vancouver pharmacy during armed robbery
    VANCOUVER — Police are warning the public about a potentially lethal drug that has been stolen from a Vancouver pharmacy.

    Police warn of powerful drug stolen from Vancouver pharmacy during armed robbery