Tuesday, May 19, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Study Involving UBC Scientist Says Chinook Salmon Could Be Wiped Out By 2100

    Study Involving UBC Scientist Says Chinook Salmon Could Be Wiped Out By 2100
    VANCOUVER — New climate-change research involving a University of British Columbia scientist predicts that one of the West Coast's most prized salmon stocks could be wiped out over the next 85 years.

    Study Involving UBC Scientist Says Chinook Salmon Could Be Wiped Out By 2100

    Former Vancouver Stealth Head Coach Chris Hall Dies Of Cancer At 64

    Former Vancouver Stealth Head Coach Chris Hall Dies Of Cancer At 64
    VANCOUVER — Chris (C.H.) Hall, former head coach of the National Lacrosse League's Vancouver Stealth, has died after a four-year battle with cancer.

    Former Vancouver Stealth Head Coach Chris Hall Dies Of Cancer At 64

    Canada faces new Cold War in Europe and hot war against ISIL in Iraq in 2015

    Canada faces new Cold War in Europe and hot war against ISIL in Iraq in 2015
    OTTAWA — It could very well be that 2014 is remembered as the year when Canada traded one shadow war for possibly two others.

    Canada faces new Cold War in Europe and hot war against ISIL in Iraq in 2015

    Man arrested in Montreal on terrorism-related charge

    Man arrested in Montreal on terrorism-related charge
    MONTREAL — A Montreal man is facing a terrorism-related charge after police were tipped off by his family that he had recently become radicalized.

    Man arrested in Montreal on terrorism-related charge

    Man charged with kidnapping, attempted murder of six-year-old in Alberta

    Man charged with kidnapping, attempted murder of six-year-old in Alberta
    EDMONTON — A 21-year-old man has been charged with attempted murder, aggravated sexual assault and kidnapping in an attack on a six-year-old girl on a reserve west of Edmonton.

    Man charged with kidnapping, attempted murder of six-year-old in Alberta

    Minister Steve Ashton resigns, says he will seek leadership of Manitoba NDP

    Minister Steve Ashton resigns, says he will seek leadership of Manitoba NDP
    WINNIPEG — Manitoba's transportation minister says resigning from cabinet before launching a leadership campaign to become the province's next premier was the honourable thing to do.

    Minister Steve Ashton resigns, says he will seek leadership of Manitoba NDP