Wednesday, May 20, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Social justice found online voice in 2014: Experts say

    Social justice found online voice in 2014: Experts say
    TORONTO — Celebrity watchers and armchair coaches may have produced the most social media chatter over the past 12 months, but those tuned into the web's global conversations believe 2014 will be remembered as the time when social justice advocates found their voice.

    Social justice found online voice in 2014: Experts say

    Jurors in Magnotta trial spending sixth day trying to reach a verdict

    Jurors in Magnotta trial spending sixth day trying to reach a verdict
    MONTREAL — It is Day 6 of deliberations for jurors in the Montreal trial of Luka Rocco Magnotta.

    Jurors in Magnotta trial spending sixth day trying to reach a verdict

    BlackBerry looks to autos, connected homes as avenues for growth in its recovery

    BlackBerry looks to autos, connected homes as avenues for growth in its recovery
    WATERLOO, Ont. — BlackBerry is hoping not only to return to the hearts and minds of smartphone users but, starting next year, the company wants to get into their cars and homes too.

    BlackBerry looks to autos, connected homes as avenues for growth in its recovery

    Pot still preferred drug in Canadian army, while cocaine gains ground: report

    Pot still preferred drug in Canadian army, while cocaine gains ground: report
    HALIFAX — Marijuana remains the drug of choice for members of the Canadian army, based on the Force's latest blind drug testing report that also found cocaine is gaining popularity among some members.

    Pot still preferred drug in Canadian army, while cocaine gains ground: report

    A look at what went wrong with the Nutrition North food subsidy program

    A look at what went wrong with the Nutrition North food subsidy program
    IQALUIT, Nunavut — For years, northerners have complained about Nutrition North to anyone who would listen, grumbling that the $60-million annual federal food subsidy was doing little to ease their staggering grocery costs.

    A look at what went wrong with the Nutrition North food subsidy program

    Federal polls show race is tightening but can't explain the reasons why

    Federal polls show race is tightening but can't explain the reasons why
    OTTAWA — A spate of public opinion surveys this autumn has prompted the usual end-of-year parsing of political fortunes and chin-stroking prognostications about a federal election that may still be 10 months in the future.

    Federal polls show race is tightening but can't explain the reasons why