Wednesday, May 20, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Police say 3-year-old boy struck in face, abandoned at Surrey, B.C., bus stop

    Police say 3-year-old boy struck in face, abandoned at Surrey, B.C., bus stop
    SURREY, B.C. — RCMP say they have made an arrest after receiving reports that a three-year-old boy was struck in the face and abandoned at a bus stop in Surrey, B.C.

    Police say 3-year-old boy struck in face, abandoned at Surrey, B.C., bus stop

    SkyTrain service in Metro Vancouver area halted by electrical fault

    SkyTrain service in Metro Vancouver area halted by electrical fault
    VANCOUVER — SkyTrain service has been halted between two busy stations in the Metro Vancouver area after what transit officials believe is an electrical fault.

    SkyTrain service in Metro Vancouver area halted by electrical fault

    B.C. poultry supply unaffected by avian flu; turkeys brought in to meet demand

    B.C. poultry supply unaffected by avian flu; turkeys brought in to meet demand
    VANCOUVER — Poultry producers are assuring B.C. residents there will be plenty of turkeys on store shelves during the holidays despite an avian flu outbreak that has killed thousands of animals.

    B.C. poultry supply unaffected by avian flu; turkeys brought in to meet demand

    Oilsands leak that fouled aquifer is close to site where oil bubbled to surface

    Oilsands leak that fouled aquifer is close to site where oil bubbled to surface
    EDMONTON — A Canadian Natural Resources Ltd. oilsands operation that has contaminated a groundwater aquifer is renewing questions about a technology that has already been linked to another serious leak in northern Alberta.

    Oilsands leak that fouled aquifer is close to site where oil bubbled to surface

    Judge at Magnotta trial says Twitter account in his name isn't his

    Judge at Magnotta trial says Twitter account in his name isn't his
    MONTREAL — The judge in Luka Rocco Magnotta's first-degree murder trial says he is "flabbergasted" and "not amused" about what he calls a fake Twitter account bearing his name.

    Judge at Magnotta trial says Twitter account in his name isn't his

    Rainfall Warning In Metro Vancouver Leads BC Ferries To Cancel Some Sailings

    Rainfall Warning In Metro Vancouver Leads BC Ferries To Cancel Some Sailings
    Environment Canada issued a rainfall warning for Metro Vancouver with some 50 millimetres expected to drench the region on Saturday.

    Rainfall Warning In Metro Vancouver Leads BC Ferries To Cancel Some Sailings