Wednesday, May 20, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Russia vows to retaliate against Canadian sanctions

    Russia vows to retaliate against Canadian sanctions
    Russia vowed to take retaliatory measures against fresh US and Canadian sanctions, calling the moves an evidence that the West lacks interest in settling the Ukraine crisis....

    Russia vows to retaliate against Canadian sanctions

    Mounties investigating after toddler found alone at Surrey bus stop

    Mounties investigating after toddler found alone at Surrey bus stop
    SURREY, B.C. — The RCMP are investigating after a toddler was left on his own at a Surrey, B.C. bus stop Saturday morning.

    Mounties investigating after toddler found alone at Surrey bus stop

    Desjardins says Hansen looks OK after collapsing on bench and leaving game

    Desjardins says Hansen looks OK after collapsing on bench and leaving game
    Vancouver Canucks coach Willie Desjardins says forward Jannik Hansen looks to be OK after he appeared to collapse on the bench following a hit during Saturday's game.

    Desjardins says Hansen looks OK after collapsing on bench and leaving game

    Canadian man shot by U.S. border guards after pointing gun at them: officials

    Canadian man shot by U.S. border guards after pointing gun at them: officials
    DETROIT — The U.S. border agency says a Canadian man was shot after allegedly pointing a handgun at guards at the Ambassador Bridge crossing between Windsor, Ont., and Detroit.

    Canadian man shot by U.S. border guards after pointing gun at them: officials

    Slain soldiers Cirillo and Vincent named Canada's Newsmaker of the Year

    Slain soldiers Cirillo and Vincent named Canada's Newsmaker of the Year
    TORONTO — Two Canadians killed in cold blood on home soil for simply wearing a soldier's uniform have been selected the country's Newsmaker of the Year for 2014.

    Slain soldiers Cirillo and Vincent named Canada's Newsmaker of the Year

    2 winning tickets for Saturday night's $5-million Lotto 649 jackpot

    2 winning tickets for Saturday night's $5-million Lotto 649 jackpot
    TORONTO — Christmas has come a few days early for the owners of the two winning tickets in Saturday night's Lotto 6-49 draw.

    2 winning tickets for Saturday night's $5-million Lotto 649 jackpot