Thursday, July 2, 2026
ADVT 
National

Permanent fixes coming for Coquihalla in B.C.

Darpan News Desk The Canadian Press, 24 Mar, 2022 09:36 AM
  • Permanent fixes coming for Coquihalla in B.C.

HOPE, B.C. - The Ministry of Transportation and Infrastructure says it is moving ahead with permanent repairs to a key B.C. highway damaged by catastrophic flooding last November.

A statement from the ministry says it has begun the process to select contractors to design and complete the repairs at three of the seven damaged bridges along the Coquihalla Highway.

The ministry says the work will return the highway to four lanes along a section between its summit and 50 kilometres south of Merritt.

It's expected contracts for the bridges will be awarded by late April or early May, with construction slated for the summer and completion by the end of this year.

The ministry says permanent repairs are also a priority along the damaged Othello section of the highway just east of Hope and a tender package is being prepared for contractors.

Work on permanent repairs to the other flood-damaged highways, including Highway 1 through the Fraser Canyon and Highway 8 in the Nicola Valley, is planned and the ministry says it expects to share more details in the coming weeks.

Transportation Minister Rob Fleming says the repairs will leave the highway in better condition than it was before a storm known as an atmospheric river dumped record-breaking amounts of rain on much of southern B.C. last year, causing floods, slides and washouts.

Efforts will be made to minimize traffic disruptions during peak travel times and to complete the work overnight where possible, but the ministry says delays, including periods of single-lane alternating traffic and short, intermittent full closures, are expected throughout construction.

MORE National ARTICLES

Economy recovering but some sectors weak: Trudeau

Economy recovering but some sectors weak: Trudeau
Statistics Canada is reporting that the economy contracted at an annualized rate of 1.1 per cent between April and June, and estimates another drop in real gross domestic product in July.

Economy recovering but some sectors weak: Trudeau

New COVID-19 modelling numbers coming in B.C.

New COVID-19 modelling numbers coming in B.C.
On Monday, the province reported seven more deaths and 1,853 new cases of COVID-19 diagnosed over a three-day period from Friday to Monday. From Friday to Saturday, there were 769 cases, but the number dropped to 503 on Sunday to Monday.

New COVID-19 modelling numbers coming in B.C.

O'Toole, Singh campaign denounce protesters

O'Toole, Singh campaign denounce protesters
The leader's warning came one day after several Conservative campaign workers were spotted among a crowd of raucous protesters who forced the cancellation of a Liberal event featuring Justin Trudeau in Bolton, Ont.

O'Toole, Singh campaign denounce protesters

'Reconsider' travel to Canada, U.S. CDC warns

'Reconsider' travel to Canada, U.S. CDC warns
The new Level 3 travel advisory, issued today, marks a quick end to a three-week period when the warning to would-be travellers to Canada had been eased to "exercise increased caution."

'Reconsider' travel to Canada, U.S. CDC warns

1853 COVID19 cases over 3 days

1853 COVID19 cases over 3 days
84.2% (3,904,121) of eligible people 12 and older in B.C. have received their first dose of COVID-19 vaccine and 76.4% (3,541,731) received their second dose.

1853 COVID19 cases over 3 days

Cleaning, dietary workers coming back in-house at B.C. hospitals

Cleaning, dietary workers coming back in-house at B.C. hospitals
The province is working with the Hospital Employees' Union, health authorities and contractors on its plan, he said. The transition to government employment will end before most of the contracts expire by March, Dix said.

Cleaning, dietary workers coming back in-house at B.C. hospitals