Thursday, June 11, 2026
ADVT 
National

'Road Zipper' To Bring Rush-hour Relief For Alex Fraser Bridge Commuters

Darpan News Desk, 13 Dec, 2019 10:27 PM

    Unique to Western Canada, a moveable barrier system with a zipper truck is about to make its debut on the Alex Fraser Bridge to make this key crossing safer and faster for commuters.


    This innovative type of counterflow improves capacity on the bridge and eliminates potential for cross-over collisions during counterflow, as traffic is continually separated by barriers. The system is in the testing phase and expected to be in place for drivers sometime in mid-December 2019.


    “The Alex Fraser Bridge project shows how we are working closely with our partners to build the modern transportation infrastructure needed to keep people safe and support long-term economic growth,” said Catherine McKenna, federal Minister of Infrastructure and Communities. “Together, we are helping communities make positive changes to improve people’s lives, keep our businesses competitive and reduce carbon emissions for our children and grandchildren.”


    Ravi Kahlon, MLA for Delta-North, on behalf of Claire Trevena, B.C.’s Minister of Transportation and Infrastructure, hosted a preview of the zipper truck in action near the weigh scale at Nordel Way on Dec. 12, 2019.


    “I’m thrilled to welcome the zipper system to the Alex Fraser Bridge, which will create an additional lane during peak times and keep drivers protected by barriers,” said Kahlon. “It will make a noticeable and positive difference for about 120,000 people who drive across the Alex Fraser Bridge every day, getting people to work and back home to their families more quickly and reliably.”


    The extra lane will be in place for northbound traffic every weekday from 4:30 a.m. to 11:30 a.m. to help ensure a more efficient and consistent travel time during the morning commute. Outside of these hours, the fourth lane will be open to ease congestion for southbound traffic.


    Upgrades for cyclists and pedestrians include new wayfinding signs, better access via the Cliveden Avenue interchange, widening narrow sections of sidewalk on the bridge and improving the Cliveden and Nordel pathways.


    Previously completed work includes:


    strengthening the bridge to accommodate the additional weight of another lane of traffic (repairing the main span deck, modifying expansion joints and stiffening girders);


    creating a seventh lane to the bridge by removing the shoulders and reconfiguring the pre-existing six lanes from 3.7 metres to 3.55 metres wide;


    adding additional lanes southbound on Highway 91 between Nordel Way and 72nd Avenue; and


    upgrading the Cliveden Avenue and Nordel Way interchanges, including a new signal for traffic accessing the Alex Fraser Bridge northbound from Nordel Way.


    The South of Fraser Advance Traveller Information System portion of the project is ongoing and expected to be finished in spring 2020.

    Thirteen new dynamic message signs are being installed that will predict the estimated travel time on four major Fraser River crossings — Alex Fraser Bridge, Port Mann Bridge, Pattullo Bridge and the George Massey Tunnel. Signs allowing drivers to choose their best route will be located along Highway 17, Highway 1, Highway 10, Marine Way and Knight Street.


    Quick Facts:


    To help keep travellers safe and traffic flowing efficiently as part of the counterflow operations, the speed limit on the Alex Fraser Bridge has been permanently lowered from 90 km/h to 70 km/h.


    The $70-million Alex Fraser Bridge capacity-improvement project is funded by the Government of Canada (more than $32.7 million) and the Province of B.C. (more than $37.3 million).

    MORE National ARTICLES

    UPDATE: Collision With Motorcycle In Cloverdale Results In Serious Injuries

    UPDATE: Collision With Motorcycle In Cloverdale Results In Serious Injuries
    On August 17th at approximately 12:00 AM, Surrey RCMP responded to a two vehicle collision at the intersection of 56th Avenue at 184th Street.

    UPDATE: Collision With Motorcycle In Cloverdale Results In Serious Injuries

    MISSING: Police Looking For 34 Year Old Pregnant Brampton Woman BARINDER KAUR

    Barinder Kaur is female, South Asian, 5’1”, 165 pounds, brown eyes and long, straight black hair.

    MISSING: Police Looking For 34 Year Old Pregnant Brampton Woman BARINDER KAUR

    Mountie Not Guilty Of Manslaughter

    THOMPSON, Man. - A northern Manitoba RCMP officer has been found not guilty of manslaughter for an on-duty shooting that killed a drunk driver and injured a passenger.    

    Mountie Not Guilty Of Manslaughter

    Scheer Again Urges RCMP To Investigate PM

    OTTAWA - Conservative Leader Andrew Scheer says the federal ethics commissioner's stinging conclusions about Justin Trudeau's handling of the SNC-Lavalin affair appear to align with a criminal offence.

    Scheer Again Urges RCMP To Investigate PM

    Entrepreneurs Turn Beer Waste Into Profits

    VANCOUVER - When Jeff Dornan opened a brewery six years ago, he knew the brewing process would produce hundreds of kilograms of spent grain, and he had a plan for it.

    Entrepreneurs Turn Beer Waste Into Profits

    Chinese Officials Fire Back At Freeland Over Hong Kong

    Freeland made the remarks in a joint statement issued Saturday with her counterpart in the European Union, Federica Mogherini, urging restraint amid "a rising number of unacceptable violent incidents."

    Chinese Officials Fire Back At Freeland Over Hong Kong